Dianthus

  • About
  • Contact

Dianthus

Planning and Designing a New Home for our Family in Houghton, Stockbridge

  • Facebook
  • LinkedIn
  • Twitter
  • Instagram

Category: Substructure

Construction Programme Houghton Piling Substructure Test Valley Test Way

Dianthus Drone Video

Posted on November 21, 2020 by Dianthus
Reading time less than 1 minute
Architecture Design Construction Programme Demolition and Groundworks Drainage Substructure

Groundworks, Sewage Treatment Plant and Drainage Construction

Posted on November 16, 2020 by Dianthus
Reading time 3 minutes
Construction Programme Demolition and Groundworks Substructure

Week 31: Completed Transfer Slab for Pavilion and Lockdown

Posted on April 3, 2020 by Dianthus
Reading time 1 minute
Construction Programme Demolition and Groundworks Piling Substructure

Week 29: Drainage and Preparation for Pavilion Transfer Slab

Posted on March 10, 2020 by Dianthus
Reading time 4 minutes
Construction Programme Demolition and Groundworks Piling Substructure

Week 28: Casting the Basement Transfer Slab

Posted on February 27, 2020 by Dianthus
Reading time 1 minute
Architecture Design Construction Programme Demolition and Groundworks Piling Substructure

Week 26: Preparing to Transfer the Basement Slab

Posted on February 11, 2020 by Dianthus
Reading time 10 minutes
Construction Programme Demolition and Groundworks Piling Substructure

Week 25: Completing the Basement Inner Wall and Supporting Pillars

Posted on January 29, 2020 by Dianthus
Reading time 2 minutes
Construction Programme Demolition and Groundworks Piling Substructure

Week 24: Pouring the Concrete to form the Basement Inner Wall

Posted on January 17, 2020 by Dianthus
Reading time 2 minutes
Construction Programme Demolition and Groundworks Piling Substructure

Week 23: Formwork, Installing Shuttering to Cast the Basement Wall

Posted on January 10, 2020 by Dianthus
Reading time 1 minute

Posts navigation

Older posts

Categories

  • Construction Programme (43)
  • Substructure (19)
  • Superstructure (18)
  • Piling (16)
  • Demolition and Groundworks (15)

Tags

  • Dianthus (11)
  • Accessibility (2)
  • Living (2)
  • The Journey Begins (2)
  • Wheelchair (2)

Year

  • 2024 (1)
  • 2023 (5)
  • 2021 (17)
  • 2020 (20)
  • 2019 (28)

Dianthus

Dianthus Logo

Website Powered by WordPress.com.

  • Facebook
  • LinkedIn
  • Twitter
  • Instagram
Dianthus
Website Powered by WordPress.com.
Privacy & Cookies: This site uses cookies. By continuing to use this website, you agree to their use.
To find out more, including how to control cookies, see here: Cookie Policy
  • Subscribe Subscribed
    Dianthus

    Have a WordPress.com account? Log in now.

  • Dianthus
    View site in Reader
    Manage subscriptionsSign upLog in
    Report this content
    Collapse this bar
Loading Comments...