Dianthus

  • About
  • Contact

Dianthus

Planning and Designing a New Home for our Family in Houghton, Stockbridge

  • Facebook
  • LinkedIn
  • Twitter
  • Instagram

Category: Substructure

Construction Programme Demolition and Groundworks Piling Substructure

Christmas and New Year Fire Break

Posted on January 3, 2020 by Dianthus
Reading time 1 minute
Construction Programme Piling Substructure

Week 21:Pouring the Concrete to form the Basement Slab and Wall

Posted on December 12, 2019 by Dianthus
Reading time 1 minute
Construction Programme Demolition and Groundworks Substructure

Week 20: Preparation for Basement Floor and Pile Cap

Posted on December 9, 2019 by Dianthus
Reading time 1 minute
Construction Programme Demolition and Groundworks Piling Substructure

Week 19: Sika Waterproof Membrane

Posted on November 22, 2019 by Dianthus
Reading time less than 1 minute
Construction Programme Demolition and Groundworks Piling Substructure

Week 18: Drainage and Ducting of the Basement

Posted on November 18, 2019 by Dianthus
Reading time 1 minute
Construction Programme Demolition and Groundworks Substructure

Week 17: Excavating the Spoil from within the Retaining Wall

Posted on November 6, 2019 by Dianthus
Reading time 2 minutes
Demolition and Groundworks Piling Substructure

Week 16-Propping the Capping Beams with Steel Re-Inforcement

Posted on October 31, 2019 by Dianthus
Reading time 2 minutes
Construction Programme Piling Substructure

Week 15-Substructure-Preparing the Steel Reinforcement for Pouring the Capping Beam

Posted on October 21, 2019 by Dianthus
Reading time 3 minutes
Construction Programme Piling Substructure

Week 12-Substructure-Preparing the ground for Pouring Capping Beam

Posted on October 5, 2019 by Dianthus
Reading time 1 minute

Posts navigation

Older posts
Newer posts

Categories

  • Construction Programme (43)
  • Substructure (19)
  • Superstructure (18)
  • Piling (16)
  • Demolition and Groundworks (15)

Tags

  • Dianthus (11)
  • Accessibility (2)
  • Living (2)
  • The Journey Begins (2)
  • Wheelchair (2)

Year

  • 2024 (1)
  • 2023 (5)
  • 2021 (17)
  • 2020 (20)
  • 2019 (28)

Dianthus

Dianthus Logo

Website Powered by WordPress.com.

  • Facebook
  • LinkedIn
  • Twitter
  • Instagram
Dianthus
Website Powered by WordPress.com.
Privacy & Cookies: This site uses cookies. By continuing to use this website, you agree to their use.
To find out more, including how to control cookies, see here: Cookie Policy
  • Subscribe Subscribed
    Dianthus

    Have a WordPress.com account? Log in now.

  • Dianthus
    View site in Reader
    Manage subscriptionsSign upLog in
    Report this content
    Collapse this bar
Loading Comments...