Construction Programme Demolition and Groundworks Piling Substructure Week 25: Completing the Basement Inner Wall and Supporting Pillars
Construction Programme Demolition and Groundworks Piling Substructure Week 24: Pouring the Concrete to form the Basement Inner Wall
Construction Programme Demolition and Groundworks Piling Substructure Week 23: Formwork, Installing Shuttering to Cast the Basement Wall
Construction Programme Demolition and Groundworks Piling Substructure Christmas and New Year Fire Break
Construction Programme Piling Substructure Week 21:Pouring the Concrete to form the Basement Slab and Wall
Architecture Design Detailed Design Electric Vehicle Charging Sustainability Future Proofing with Electric Vehicle Charging Points