Architecture Design Construction Programme Demolition and Groundworks Drainage Substructure Groundworks, Sewage Treatment Plant and Drainage Construction
Construction Programme Demolition and Groundworks Substructure Week 31: Completed Transfer Slab for Pavilion and Lockdown
Construction Programme Demolition and Groundworks Piling Substructure Week 29: Drainage and Preparation for Pavilion Transfer Slab
Construction Programme Demolition and Groundworks Piling Substructure Week 28: Casting the Basement Transfer Slab
Architecture Design Construction Programme Demolition and Groundworks Piling Substructure Week 26: Preparing to Transfer the Basement Slab
Construction Programme Demolition and Groundworks Piling Substructure Week 25: Completing the Basement Inner Wall and Supporting Pillars
Construction Programme Demolition and Groundworks Piling Substructure Week 24: Pouring the Concrete to form the Basement Inner Wall
Construction Programme Demolition and Groundworks Piling Substructure Week 23: Formwork, Installing Shuttering to Cast the Basement Wall
Construction Programme Demolition and Groundworks Piling Substructure Christmas and New Year Fire Break