Construction Programme Piling Substructure Week 21:Pouring the Concrete to form the Basement Slab and Wall
Construction Programme Demolition and Groundworks Substructure Week 20: Preparation for Basement Floor and Pile Cap
Construction Programme Demolition and Groundworks Piling Substructure Week 19: Sika Waterproof Membrane
Construction Programme Demolition and Groundworks Piling Substructure Week 18: Drainage and Ducting of the Basement
Construction Programme Demolition and Groundworks Substructure Week 17: Excavating the Spoil from within the Retaining Wall
Demolition and Groundworks Piling Substructure Week 16-Propping the Capping Beams with Steel Re-Inforcement
Construction Programme Piling Substructure Week 15-Substructure-Preparing the Steel Reinforcement for Pouring the Capping Beam
Construction Programme Piling Substructure Week 12-Substructure-Preparing the ground for Pouring Capping Beam