Construction Programme Demolition and Groundworks Piling Substructure Week 19: Sika Waterproof Membrane
Construction Programme Demolition and Groundworks Piling Substructure Week 18: Drainage and Ducting of the Basement
Demolition and Groundworks Piling Substructure Week 16-Propping the Capping Beams with Steel Re-Inforcement
Construction Programme Piling Substructure Week 15-Substructure-Preparing the Steel Reinforcement for Pouring the Capping Beam
Construction Programme Piling Substructure Week 12-Substructure-Preparing the ground for Pouring Capping Beam
Construction Programme Piling Substructure Substructure- Preparing to Pour Capping Beam for Basement Construction