Construction Programme Demolition and Groundworks Substructure Week 20: Preparation for Basement Floor and Pile Cap
Construction Programme Demolition and Groundworks Piling Substructure Week 19: Sika Waterproof Membrane
Construction Programme Demolition and Groundworks Piling Substructure Week 18: Drainage and Ducting of the Basement
Construction Programme Demolition and Groundworks Substructure Week 17: Excavating the Spoil from within the Retaining Wall
Demolition and Groundworks Piling Substructure Week 16-Propping the Capping Beams with Steel Re-Inforcement